Projects
CSC Project 4
Project facts
- Status
- Completed
- Address
- 750 SE Catawba Rd
- City
- Port Clinton, Ohio
- Region
- Ohio
- Submarket
- Sandusky; Port Clinton
- Amenity tier
- Standard
- Construction
- Post-Frame
- Finish level
- Basic
- Year built
- 2024
- Flood zone
- X
Location Summary
CSC Project 4 is a storage condominium at 750 SE Catawba Road in Port Clinton, Ohio, developed by Storage Condominiums, Inc., which sells its units by warranty deed. The developer lists Buildings 6, 7 and 8 as completed in 2024, and the numbering implies earlier buildings on the site. It sits beside the developer's CSC Project 6, which is marketed separately. Unit sizes have not been published, and no amenity tier has been set. The project is completed.
The site lies on the Catawba Road corridor outside Port Clinton in Ottawa County, near Lake Erie and the Catawba Island peninsula, with Erie-Ottawa International Airport nearby. Demand drivers include Lake Erie boating and fishing, the island ferries and resorts of the western basin, and the owners of lakefront cottages who need secure storage for boats and vehicles.
The SCK national database holds 23 other storage and flex condo projects in Ohio. Of those, 8 are in the Sandusky and Port Clinton submarket, including the same developer's CSC Project 5 and CSC Project 6.